Ask for more information
Are you interested in this property? Use our application form for more information. Ask for informationContact Information
Details
Refrence: #41371City: Santo Domingo Oeste
Sector: Los Hidalgos
Rooms: 4
Baths: 3
Parking: 2
M2 Area: 210
Status: In construction Year: 2024
Facilities
-
Access to electricity and drinking water, Playground, Laundry Area, Social Area, Balcony, Dining Room, Electricity 24 hours, Gym, Patio, Swimming Pool, Electric Power Plant, Electric Gate, Gated Community, Security 24 hours, Terrace,
Description
Project of 2 modern houses of 2 levels, located in Residencial los Hidalgos km 14 Duarte highway, Santo Domingo Oeste, entering through Banco Popular.
— 210 square meters of construction area, consisting of 2 levels.
Also with 96m2 of roof terraces. 75m2 patio.
— Backyard.
— 1ERA porcelain tile and imported ceramics.
— Finishing doors and kitchen in precious wood.
- 1st grade porcelain staircase and stainless steel handrail.
_Interior access staircase to the roof terrace.
— Double canopy, comfortable and spacious.
— Ceiling and cornices in plaster.
— Cistern with its automatic water pump.
— Finishing and interior finish in putty.
— Living room and dining room ceiling decoration with sheet rock fascia.
— 4 spacious rooms.
— Master bedroom with bathroom and W/Closet.
— Family room on 2nd level.
— 2 balconies on the 2nd level, front and rear.
— Gallery and green areas.
— Service room with its bathroom.
— Separate entrance and integrated laundry area.
— 1/2 bathroom for visitors.
— intercom.
_ Pre-installation of inverter.
— Pre-installation of security cameras.
_ Pre installation of water tank.
— Gas pre-installation.
— Pre-installation of air.
24 hour water and electricity service.
— Picuzzi and optional terrace (not included in the price).
5 minutes from , supermarket, shops, pizzerias, banks, clinic, and the 3rd line of the subway.
Way to pay
— separated with: 10,0000 US.
— Initial: 30% when filming the contract with the option of several monthly installments until said initial is completed and 70% is paid upon delivery of the property.
- Delivery
1st stage 2 months.
2nd stage 6 months.
— Financing available at your preferred bank or direct payment.